# [Faster Engineering Projects: It’s Time to Automate Project Turnover](https://www.synergissoftware.com/blog/time-to-automate-project-turnover)

 Written by [Livia Wiley](https://www.synergissoftware.com/blog/author/livia-wiley) | Mar 26, 2025 6:08:27 PM

Over the summer our local McDonald’s closed for two months to expand their drive-thru from one to two lanes. I wondered then, how could a business afford to be closed for so long and during peak outdoor hours? The average McDonald’s makes $6,500/day. At a cost of 60 days, that’s approximately $390K in lost revenue, and that’s not including the cost of the construction. Although this is a small-scale example, you could imagine the benefit to the business if the construction could be completed 10% faster—say 52 days instead of 60 days—that’s $39K in savings. On a larger scale, like a chemical manufacturing plant, a mere 1 or 2 days faster could mean millions of dollars. 

<https://www.synergissoftware.com/hs/cta/wi/redirect?encryptedPayload=AVxigLKUpbNqNI1opQwd9rIh0pEfzYxP%2B1ZHxtuY%2BBp4zEfI8TvLWhSLN73nSvFgzRQbYdv1QhN4EAnGV83VauNoUYk3PAVqkcIkVjnDqIPVnB93HO6Fr4XqrIDYAVK1Q0GHZ%2B9VnQ00O6bNN6hOHPBXNR3tBvG1mB8aHEPUg2ztZ1IjZjlEexFHG1BphW5pCSQkU83ZHXDLwYygozcWOISe1fRSSuADFuJrJrks3XVyZc9sV07sQ4gRU6A4fw%3D%3D&webInteractiveContentId=186822694301&portalId=7669934>

McKinsey reports that as many as [90% of major capital projects](https://www.mckinsey.com/capabilities/operations/our-insights/megaprojects-the-good-the-bad-and-the-better) suffer from an average of approximately 28% over budget with delays of [six months to two years](https://www.mckinsey.com/capabilities/operations/our-insights/capital-investment-is-about-to-surge-are-your-operations-ready). In 73% of the cases, spend overrun was caused by [poor project execution](https://www.mckinsey.com/industries/capital-projects-and-infrastructure/our-insights/megaprojects-the-good-the-bad-and-the-better). Typically poor execution is blamed on poor document management. In one study, 75% of respondents said that project document issues caused the overruns with a further 25% saying that poor documentation had led to construction delays.  

For chemical manufacturers, handover costs alone can easily account for [1 to 2% of total CAPEX](https://www.synergissoftware.com/hubfs/SSD_PDFs/SynergisSoftware-BringOrderChaos-ebook.pdf) costs and can take a year or more to complete. Up to 50% of projects experience issues due to inadequate knowledge transfer during handovers. This can force owner-operators to spend 2 to 4% of the project cost to correct and/or reproduce missing operations and maintenance information manually.  

It's time to take control of your project content across all phases of design, construction, and handover. Adept gives owner/operators and EPCs a centralized digital platform that improves productivity, facilitates communication, [simplifies workflows and collaboration](https://www.synergissoftware.com/solutions/by-industry/engineering-and-construction), empowers decision-making, and accelerates handover. You can easily connect your project teams, documents, deliverables, and workflows to optimize existing plant transformations and/or new capital engineering projects. You can expect:  

- **No more project delays: **Using a centralized platform for collaboration ensures the right people have access to the right information. No more overruns on cost or schedule.  

- **Seamless CAD integration. **Having EDM available inside your CAD application enhances design workflow while maintaining file relationships.  

- **Better ROI on capital projects. **EDM can enhance project planning, budgeting and outcomes to satisfy expectations from regulators, shareholders, and other stakeholders.  

*We have a construction crew of hundreds plus hundreds of sites. We have three quarters of a million files of just our engineering technical documentation. Far and away, the reason that we went to Adept was the ability to gain trusted access to documents.*  

—[Susan Stanley, Interstates](https://www.synergissoftware.com/video-customer-success-interstates) 

By consistently finding the latest document version, site, and central engineers can more efficiently use capital, reduce errors and related rework, and ultimately accelerate project start up by 1 – 2 days. [See real customer value at right.](https://www.synergissoftware.com/15min-dow-chemical) You’ll complete projects on time and under budget, improve design quality, lower project costs, reduce project risk, and increase profitability. 

*Dow personnel emphasize consistent work process execution across all sites around the world. We have a sizable investment in written best practices for process design, project execution and plant operation that provide a significant and sustainable competitive advantage for Dow. *—[Gregg Schuler, Former Product Manager for Data Integration & EDM, Dow](https://www.synergissoftware.com/15min-dow-chemical) 

Some Adept customers have experienced [35% faster project handover](https://www.synergissoftware.com/solutions/by-industry/engineering-and-construction) to operations by avoiding costly and dangerous ambiguity, ensuring complete, consistent, and compliant data, and creating insights and efficiencies through continuous digital handover. 

*Have you considered what your engineering documents are really worth to your manufacturing organization?*  

<https://www.synergissoftware.com/hs/cta/wi/redirect?encryptedPayload=AVxigLKKgJfe%2B385v6iij%2Bs7TsfHrgFyeHfQz9UwOYa9VS9dGHT8QmIZDn9Nll9dSabWNFM1mViN24R%2BzCnBAupiOVqBE0qGlJG26UYz7sALJuEDTZwtF8lGK9XR%2B9IPd5UfjGi6wLazQxclT3RJm0ksVEWfX8l56RC2Sxd9IF6eoLibw6iDJXCRyxfEed29agqRifibdewU6unytj6QUKc%2BltxQXy1Ou%2BTcdXIG3%2BrtNP4%3D&webInteractiveContentId=186824915779&portalId=7669934>

 

 

[View full post](https://www.synergissoftware.com/blog/time-to-automate-project-turnover)

```json
{
  "@context" : "http://schema.org",
  "@type" : "BlogPosting",
  "author" : {
    "@type" : "Person",
    "name" : "Livia Wiley"
  },
  "dateModified" : "2025-03-26T18:08:27.615Z",
  "datePublished" : "2025-03-26T18:08:27Z",
  "headline" : "Faster Engineering Projects: It’s Time to Automate Project Turnover",
  "image" : {
    "@type" : "ImageObject",
    "height" : 837,
    "url" : "https://www.synergissoftware.com/hubfs/2025_03_BlogSeries_3_billboard.png",
    "width" : 1600
  },
  "mainEntityOfPage" : "https://www.synergissoftware.com/blog/time-to-automate-project-turnover",
  "publisher" : {
    "@type" : "Organization",
    "logo" : {
      "@type" : "ImageObject",
      "height" : 60.0,
      "url" : "https://f.hubspotusercontent30.net/hubfs/7669934/assets/logos/synergis-software-logo@2x.png",
      "width" : 159.33334
    },
    "name" : "Blog"
  }
}
```